Post-Incentive Auction Window Opens for Modifications by Repacked TV Stations that Can’t Build on Their Assigned Channel

According to a report by Broadcast Law Blog, the FCC announced the first of the post-auction filing windows for TV stations that have to move from their current channels as a result of the post-spectrum auction repacking.

The first window, open from August 9 to September 8, is for a limited number of TV stations that fall into two classes: (1) 25 repacked stations that were granted a waiver of the July 12 filing deadline for applications for initial construction permits because the FCC agreed that those stations were unable to construct the facilities that the FCC assigned to them when they were repacked; and (2) any repacked station or any other station entitled to protection that is predicted to experience a loss of population served in excess of one percent as a result of the repacking process.

Read more here.

Leave a Reply

Your email address will not be published. Required fields are marked *